NukeDukem
Well-Known Member
- Thread starter
- #31
Not to mention all the government certifications needed.Same, I do have a little hope we will see them getting produced in 27’ with a 28’ model year. But most likely its not gonna happen, since tooling a factory can take 8-12 months after the building is made.